hk2
  1. hk2
  2. HK2-112

Allow the current job to change in the RunLevelController

    Details

    • Type: Improvement Improvement
    • Status: Resolved
    • Priority: Major Major
    • Resolution: Fixed
    • Affects Version/s: 2.2.0
    • Fix Version/s: 2.2.0
    • Component/s: None
    • Labels:
      None

      Description

      Currently if a job is currently running (up or down) in the RunLevelController attempting to call proceedTo will result in an exception being thrown. Change this so that a currently running job can be replaced with a new job. This will include the following types of changes:

      1. Up to up
      2. Down to down
      3. Up to down
      4. Down to up

        Activity

        Hide
        jwells added a comment -

        This was fixed by changing the listener and adding a ChangeableRunLevelFuture to the listener

        Show
        jwells added a comment - This was fixed by changing the listener and adding a ChangeableRunLevelFuture to the listener

          People

          • Assignee:
            jwells
            Reporter:
            jwells
          • Votes:
            0 Vote for this issue
            Watchers:
            0 Start watching this issue

            Dates

            • Created:
              Updated:
              Resolved: