Posted: January 12, 2012 18:22 by tjz
I have a chain of 6 jobs, the 1st of which is triggered by watching a Mercurial repo. Each job triggers the build of the downstream job on successful completion.

This works fine for the first 5 jobs. But if an SCM change comes in before the 6th job is to be built, I end up with jobs 1 and 6 deadlocked on each other. This only happens for the 6th (final) job.

Is this a know problem and/or is there a workaround?